San Mateo House 

San Mateo House Project

2 bathrooms and the kitchen were remodeled. The house was painted and the outdoor stone was cleaned. 


The master bathroom was completely demolished and reconfigured. We built a new shower and moved the toilet. The vanities were reconfigured into a double. We installed new mirrors with LED lights and installed new canless lights. 


The guest bathroom had a new vanity and toilet installed. 


The kitchen had the cabinets refaced and the boxes were painted. We installed new appliances and installed a new laminate floor. 


We painted the whole house. That included a high ceiling, trims, doors and walls. We replaced all the outlets and switches including their cover plates. 

Bathroom vanity with two sinks, mirrors, and beige walls in a hallway-style room
Empty beige room with hardwood floors, recessed lights, and a window with blinds