San Mateo House
San Mateo House Project
2 bathrooms and the kitchen were remodeled. The house was painted and the outdoor stone was cleaned.
The master bathroom was completely demolished and reconfigured. We built a new shower and moved the toilet. The vanities were reconfigured into a double. We installed new mirrors with LED lights and installed new canless lights.
The guest bathroom had a new vanity and toilet installed.
The kitchen had the cabinets refaced and the boxes were painted. We installed new appliances and installed a new laminate floor.
We painted the whole house. That included a high ceiling, trims, doors and walls. We replaced all the outlets and switches including their cover plates.










